US 395 Canyon Creek
Flood Control/Restoration Project

US 395 Canyon Creek Flood Mitigation
Flood Control/Restoration Project
Suulutaaq, Inc. recently completed a large flood mitigation project along US 395 near Canyon City, Oregon. This project consisted of two area that had large erosion issues due to a wildfire in the location that created large runoff during the rainy season. SUU need to keep the water flowing through the project site to allow for safe passage of fish. The project was key to keeping this portion of the road open year road for commerce. Suulutaaq, Inc. was the prime contractor for this project.

Major Scope Items:
- 1,000 LF of stream excavated, riprapped and graded to fixed highway
- Temporary Diversion of stream using a 36” HDPE pipe
- Completed the project on-time and under budget.