LBRID Slope Stabilization

LBRID Slope Stabilization (Completed in 2018)

Suulutaaq repaired a failing slope behind a sewage treatment plant tank with a soldier pile wall. Piping and wiring were rerouted while maintaining operation of the system with minimal shutdown time.