Temporary Housing Site Totem MHP

Housing Site- Totem MHP(Completed in 2021) Suluutaaq Inc. successfully completed a $2.16 million fast-track project on a 5-acre site with USACE FEMA… Read More

Powder Valley Connector

Powder Valley Connector Suulutaaq placed approximately 7000 linear feet of 36” HDPE pipe, vaults and manifolds for this irrigation district project in northeastern Oregon.

LBRID Slope Stabilization

LBRID Slope Stabilization (Completed in 2018) Suulutaaq repaired a failing slope behind a sewage treatment plant tank with a soldier pile wall. Piping and wiring were rerouted while maintaining operation of the system with minimal shutdown time.