Folsom

Flood Control Projects

Folsom Dam Spillway Backfill

Suluutaaq, Inc was a subcontractor on the Joint Federal Project (JFP), a $900 million project involving the US Army Corps of Engineers (USACE) and Bureau of Reclamation (BOR).  The project consists of constructing a new concrete spillway for Folsom Reservoir.   Suulutaaq’s role in this endeavor was to supply and install a heel drain and wall backfill material behind the 32-foot high upper chute walls.  Suulutaaq also installed drainage piping and structures and constructed and paved access roads.

Performance:

SUU was the PRIME contractor.